An iOS build at PixelForce runs in four stages: a free discovery call, Phase 1 Scoping & Design at $35,000 to $65,000, Phase 2 Development, QA and Release at $100,000 to $350,000, and Phase 3 Post Launch Support. Apple reviews most submissions within 24 to 48 hours, so the part of the App Store timeline you can actually influence is not how fast the review runs - it is whether you pass it the first time. Across 100+ products shipped, PixelForce holds a 98 percent first-time app store approval rate.

What changed since this article was first published

The 2013 version of this article described a free design phase of three or four hours that ended in a development contract, and a wireframing step done largely in isolation. Two things moved.

The first is our own process. Design is now a paid, standalone phase that produces a complete blueprint, because a free phase has to stay shallow and a shallow blueprint cannot support a fixed-price build. The second is the platform. Objective-C gave way to Swift, SwiftUI changed how screens are built, and Apple periodically raises the minimum SDK that new submissions must be built against, so "current tooling" is a maintenance commitment rather than a one-off choice. As of August 2026 we build with Xcode 26 and Swift 6, targeting iOS 26.

Stage 1: The discovery call

Free, pre-engagement, and covered by a mutual non-disclosure agreement. We work through the business, the users and the vision, then give a 1-3-1 recommendation: one problem, three options with their trade-offs, one recommendation across budget, timeline and scope. Budget is aligned here rather than after a proposal, because we do not scope something a client cannot afford to build.

Stage 2: Phase 1 Scoping & Design

The mandatory first phase of every iOS build, typically $35,000 to $65,000, and a standalone commitment so you can stop after it. It produces preliminaries and two strategic workshops, a Business Requirements Document, an enterprise-grade design system and high-fidelity designs for every screen, a Product Requirements Document covering feature logic and integrations, and a fixed-cost Statement of Work for development.

On iOS this phase also settles which Apple surfaces are in scope - iPhone, iPad, Apple Watch, Apple TV - because that decision drives more of the eventual cost than almost anything else in the build.

Stage 3: Phase 2 Development, QA and Release

Development runs against the signed Statement of Work in numbered milestones. The shape is consistent even though the specifics are project-dependent: foundation setup covering the database schema, authentication framework and core API scaffolding; a prototype demo of a key technical pipeline; backend completion with cloud infrastructure and CI/CD pipelines; the app build and integration; then internal testing against the PRD acceptance criteria.

Quality assurance runs as its own discipline, on real devices in real conditions, rather than as a phase engineers do to their own work at the end. PixelForce reaches 95 percent test coverage, subject to agreed scope and engagement.

Stage 4: UAT, submission and App Store review

You run User Acceptance Testing on a real build. Defects are addressed before anything is submitted, then the app goes to Apple with its metadata, privacy disclosures, reviewer notes and working demo credentials prepared upfront.

Apple reviews most submissions within 24 to 48 hours, though a brand-new app submitted for the first time generally takes longer than an update from an established account, and sensitive categories take longer again. That clock is not ours to control. What is ours is the rejection rate, and preparing the submission properly is the whole of it: 98 percent first-time app store approval across 100+ shipped products. A rejection is rarely a technical failure. It is usually a missing demo account, an unclear privacy disclosure, or a feature a reviewer could not reach.

Stage 5: Phase 3 Post Launch Support

An app in the App Store is a product with an annual operating system release aimed at it, not a delivered project. There are two ways to engage. Warranty, Monitoring and Support is $4,000 per month and covers critical-bug defect resolution under warranty, 24/7 infrastructure monitoring, business-hours incident response and a monthly platform health report. The Product Retainer adds a roadmap workshop, continuous sprints and quarterly business reviews, priced per four-week cycle from $10,000.

What this looks like when it works

Revia reached number 3 in Apple's Health and Fitness category within 48 hours of launch, after a 4-month build. SWEAT went further: we built and scaled it from launch to a $400M acquisition by iFIT - 30 million users across 155 countries, and the platform passed Big 4 due diligence at exit. That last detail is the one worth sitting with. The code and infrastructure were examined by an acquirer's auditors, and they held.

Where to go next

The full engagement, the case studies and the current pricing sit on our iOS app development service page. If the design phase is what you are weighing up, we have written that up separately in our web design process.

Frequently asked questions

Apple reviews most submissions within 24 to 48 hours. A brand-new app submitted for the first time generally takes longer than an update from an established account, and apps in sensitive categories take longer again. The review clock is not something a developer can influence, so the number that matters is the rejection rate rather than the queue: PixelForce holds a 98 percent first-time app store approval rate across 100+ shipped products.

It is resolved and resubmitted, and it is rarely a technical failure. The common causes are a missing or expired demo account, a privacy disclosure that does not match what the app does, or a feature a reviewer could not reach. Preparing metadata, privacy disclosures, reviewer notes and working demo credentials before submission is what keeps first-time approval high, and that preparation is part of the release milestone rather than an afterthought.

It is decided in Phase 1 Scoping & Design against where your users actually are, because the answer changes the budget more than almost any other scoping decision. Building both natively costs more than building one. A single cross-platform codebase is a third option and suits some products well. The point of settling it during scoping is that it is a commercial decision with evidence behind it, not a default.

iPhone is the baseline. iPad, Apple Watch and Apple TV are each a scoping decision rather than a given, because each surface adds design, build and ongoing test effort. Deciding which surfaces are genuinely in scope during Phase 1 is one of the larger levers on the eventual cost of an iOS project.

Phase 1 Scoping & Design is typically $35,000 to $65,000 and is a standalone commitment. Phase 2 Development, QA and Release typically runs $100,000 to $350,000, set by which Apple surfaces are in scope and how much sits behind them. The $350,000 figure is a recommendation rather than a ceiling: with a larger budget we usually still advise keeping the first release within that range and investing the remainder in iteration after launch.